Reivax completes commissioning of 190MVA Boundary Dam U51 static excitation system
The project scope included:
- • Supply of three (3) static excitation systems
- • Commissioning and training
Boundary Dam, owned by Seattle City Light, is a large hydro facility in northeast Washington State with a total of 1,000MW of installed generation. Located on the Pend Oreille river, the plant is surrounded by breathtaking scenery with abundant wildlife and great fishing.
Please click the link below to access the detailed case study.